Latest edition · Friday, 13 November 2026 · BengaluruIndependent · Source-led

Launch vehicle testing

ISRO publishes revised PSLV third-stage ground-test report

The agency describes nozzle, sealing and quality-control changes after two mission anomalies. Further tests remain planned.

Report a correction
Add us as a preferred source on Google
A horizontally mounted rocket motor sends a bright exhaust plume across a concrete test stand marked SDSC SHAR and ISRO.
PSLV’s third-stage solid motor during its ground static test at Sriharikota on November 12, 2026, as captioned by ISRO. Credit: ISRO; reproduced without local modification.

ISRO’s November 12, 2026 notice records a successful ground static test of the revised third stage of the Polar Satellite Launch Vehicle (PSLV) at Sriharikota. The test follows third-stage anomalies on the PSLV-C61 and PSLV-C62 missions.

The agency’s account describes changes to the nozzle configuration to improve design margins, stronger mechanical interfaces and redundant sealing. It also records revised raw-material acceptance criteria, assembly procedures and quality checks.

Non-destructive testing procedures have been updated for integration and transportation, ISRO said. These changes concern the solid-motor stage tested on the ground; the notice does not announce clearance for PSLV’s next flight.

ISRO plans further tests after analysis and review of the firing data. The notice gives no date for the next test or a return-to-flight launch.

Reporting trail

Primary sources

Share this report

Share on LinkedIn ↗Share on X ↗

Branded story card: ISRO’s new PSLV test report details revised nozzle and sealing systems

For an image post, download the card and copy this suggested caption.

The agency describes nozzle, sealing and quality-control changes after two mission anomalies. Further tests remain planned. Read the full report: https://www.spaceexploration.in/news/pslv-revised-third-stage-ground-test #SpaceExplorationNews #SpaceNews #RocketLaunch
Download image