Latest edition · Wednesday, 4 November 2026 · BengaluruIndependent · Source-led

Earth observation

Sentinel-1D dashboard lists recovery times after two interruptions

The latest official record ends the second interruption on October 29. The entries do not establish whether missed observations can be supplied later.

Report a correction
Add us as a preferred source on Google
False-colour radar image of Bremen with a dark blue winding river and gold and blue urban and agricultural patterns
Bremen and its surroundings in false-colour radar data acquired by Sentinel-1D on November 7, 2025, and published by ESA on November 26, 2025. Historical imagery predating the October 2026 interruptions. Credit: Contains modified Copernicus Sentinel data (2025), processed by ESA. CC BY-SA 3.0 IGO (https://creativecommons.org/licenses/by-sa/3.0/igo/). Image unchanged.

The Copernicus operations dashboard lists a return to nominal Sentinel-1D operations at 15:29 UTC on October 29, 2026, following an interruption estimated to have begun at 21:30 UTC on October 28. It is the second interruption recorded for the satellite that week.

A separate dashboard entry places the earlier interruption between 16:20 UTC on October 26 and 17:32 UTC on October 27. ESA’s October 27 data-unavailability notice now carries an October 28 update stating that nominal operations had resumed.

Update, October 30: These official recovery records supersede the open-ended status in our October 28 report. The dashboard’s publication timestamps are separate from the operational end times stated in its incident descriptions.

Sentinel-1D supplies radar products through the Copernicus Data Space Ecosystem. ESA’s April 16 user-access announcement described its calibrated products as ready for integration into the operational data offer on a global scale, with access starting April 17.

The recovery times are agency status records; independent operational confirmation was unavailable at publication. Neither incident entry identifies a technical cause, counts missing observations or establishes whether data missed during the interruptions will be supplied later.

Reporting trail

Primary sources

Share this report

Share on LinkedIn ↗Share on X ↗

Branded story card: Sentinel-1D has two recorded October recoveries; missing-data status remains open

For an image post, download the card and copy this suggested caption.

The latest official record ends the second interruption on October 29. The entries do not establish whether missed observations can be supplied later. Read the full report: https://www.spaceexploration.in/news/sentinel1d-october-operations-recovery #SpaceExplorationNews #SpaceNews #SpaceScience
Download image