Northrop Grumman Corporation is an American defence and aerospace contractor formed in 1994, when Northrop bought Grumman Aerospace for $2.1 billion, and run from West Falls Church, Virginia. It trades on the New York Stock Exchange as NOC, employed roughly 95,000 people in 2025, and splits its work across four sectors: Aeronautics Systems, Mission Systems, Defense Systems and Space Systems, the last of which supplied 27 percent of 2024 revenues and is headquartered in McLean, Virginia. The company reported sales of $42.0 billion for 2025, net earnings of $4.2 billion or $29.08 a diluted share, and a record backlog of $95.7 billion at year end.

Most of its launch and cargo hardware arrived with the $9.2 billion purchase of Orbital ATK in 2018, which brought the Antares rocket, the Cygnus freighter and a solid-motor business that supplies boosters for NASA's Space Launch System. Antares flew 18 times from Pad 0A at the Mid-Atlantic Regional Spaceport on Wallops Island, Virginia, and lost one vehicle on 28 October 2014, when an Orb-3 first-stage turbopump failed six seconds after liftoff and the rocket fell back onto the pad with a Cygnus aboard. The last Antares 230+ flew on 2 August 2023; Cygnus has ridden SpaceX Falcon 9 rockets since, and the Firefly Aerospace-powered Antares 330, built around seven Miranda engines, has yet to fly.

Cygnus has delivered more than 158,000 pounds of cargo to the International Space Station since its first flight in 2013. The current Cygnus XL carries 33 percent more than the previous variant, roughly 2,600 pounds of extra capacity, but its introduction has been rough. The NG-22 mission was shelved in March 2025 after heavy equipment struck the shipping container holding its Thales Alenia Space-built pressurised cargo module, and on the first Cygnus XL flight that September two orbit-raising burns stopped earlier than planned, delaying the spacecraft's arrival at the station. The second Cygnus XL, NG-24, launched on 11 April 2026 carrying about 11,000 pounds and was captured by the station's robotic arm two days later.

Beyond resupply, Northrop Grumman was prime contractor for the James Webb Space Telescope, building the satellite bus, sunshield and deployable tower for an observatory that launched on 25 December 2021 against a NASA lifetime cost of $9.7 billion, and its SpaceLogistics unit flew the first commercial servicing docking in geostationary orbit when MEV-1 latched onto Intelsat's IS-901 on 25 February 2020 for a five-year life extension. Its Moon work has gone less smoothly. Corrosion found throughout the HALO habitation module for NASA's Lunar Gateway pushed delivery out by years; in April 2026, with the contract at $1.9 billion, NASA issued a stop-work order, and by August 2026 the two sides had recast the hardware into three Lunar Infrastructure Demo missions meant to survive the lunar night at the Moon's south pole.

What they build and operate

  • Cygnus XL · Spacecraft · Operational
    Pressurised cargo freighter for the International Space Station, carrying 33 percent more than the previous Cygnus and launching on SpaceX Falcon 9 rockets; the second XL flew in April 2026 with about 11,000 pounds aboard.[10][9][7]
  • Antares 330 · Launch vehicle · In development
    Rebuilt Antares with a Firefly Aerospace first stage using seven Miranda engines, to fly from Pad 0A at Wallops Island; it has not yet launched.[2][6]
  • Solid rocket motors · Component · Operational
    Solid rocket motors and boosters, including motors for NASA's Space Launch System and Graphite-Epoxy Motors.[1]
  • James Webb Space Telescope spacecraft element · Spacecraft · Operational
    Satellite bus, sunshield, deployable tower assembly and mid boom assembly built as prime contractor for the observatory launched on 25 December 2021.[3]
  • SpaceLogistics Mission Extension Vehicle · Service · Operational
    Satellite life-extension spacecraft that docks to ageing geostationary satellites; MEV-1 docked with Intelsat IS-901 on 25 February 2020 for five years of service.[4]
  • Lunar Infrastructure Demos · Programme · Announced
    Three missions, LID-1, LID-2 and LID-3, reusing HALO-derived power, thermal, autonomy and communications hardware to test surviving the lunar night at the Moon's south pole.[11]

Milestones

  • 1994
    Northrop bought Grumman Aerospace for $2.1 billion, creating Northrop Grumman.[1]
  • 2002
    Acquired TRW Inc. for $7.8 billion.[1]
  • 28 October 2014
    An Antares exploded six seconds after liftoff at Wallops Island and fell back onto the pad, destroying the Orb-3 Cygnus; the rocket was then operated by Orbital Sciences, which Northrop Grumman bought in 2018.[2]
  • 2018
    Acquired Orbital ATK for $9.2 billion, adding the Antares rocket, the Cygnus freighter and solid rocket motors.[1]
  • 25 February 2020
    MEV-1 docked with Intelsat's IS-901, the first commercial satellite-servicing docking in geostationary orbit.[4]
  • 25 December 2021
    The James Webb Space Telescope launched on an Ariane 5, using the Northrop Grumman-built satellite bus and sunshield.[3]
  • 02 August 2023
    The final Antares 230+ launched Cygnus NG-19, ending Antares flights until the 330 variant is ready.[2]
  • March 2025
    NASA and Northrop Grumman shelved the NG-22 resupply mission after heavy equipment damaged its pressurised cargo module in shipping from Turin.[5]
  • 29 May 2025
    Invested $50 million in Firefly Aerospace to speed the shared first stage behind Antares 330 and the Eclipse launch vehicle.[6]
  • 14 September 2025
    The first Cygnus XL launched, then had two orbit-raising burns stop earlier than planned, delaying its arrival at the space station.[7]
  • 27 January 2026
    Reported 2025 sales of $42.0 billion and a record backlog of $95.7 billion.[8]
  • April 2026
    NASA issued a stop-work order on the HALO Gateway module with the contract value at $1.9 billion.[11]
  • 11 April 2026
    The second Cygnus XL, NG-24, launched on a Falcon 9 with about 11,000 pounds of cargo and was captured by the station on 13 April.[9][10]
  • August 2026
    NASA and Northrop Grumman recast HALO hardware into three Lunar Infrastructure Demo missions for the Moon's south pole.[11]

Facilities

  • Launch Pad 0A · Mid-Atlantic Regional Spaceport, Wallops Island, Virginia, United States
    Antares launch pad.[2]
  • Space Systems sector headquarters · McLean, Virginia, United States
    Home of the sector that supplies space and launch systems to commercial and government customers.[1]

Leadership

  • Kathy Warden
    Chair, chief executive officer and president (as of 27 January 2026)[8][1]
  • David Schiller
    Vice president, civil space and sciences (as of 11 April 2026)[10][11]

Sources

  1. WikipediaNorthrop Grummanen.wikipedia.org
  2. WikipediaAntares (rocket)en.wikipedia.org
  3. WikipediaJames Webb Space Telescopeen.wikipedia.org
  4. TechCrunchIn-space satellite servicing proves successful in record-breaking orbital spacecraft operationtechcrunch.com
  5. The RegisterISS resupply and trash pickup craft postponed indefinitely after Cygnus container crunchtheregister.com
  6. Via SatelliteFirefly and Northrop Grumman's New Rocket Gets a Name, and $50M Investmentsatellitetoday.com
  7. Spaceflight NowNASA, Northrop Grumman postpone Cygnus XL arrival to ISS following propulsion issuespaceflightnow.com
  8. TradingViewNorthrop Grumman Reports Fourth Quarter and Full-Year 2025 Financial Resultstradingview.com
  9. NASANASA Science, Cargo Launch Aboard Northrop Grumman CRS-24nasa.gov
  10. Northrop GrummanNorthrop Grumman Expands Cargo Capacity with NG-24 Cygnus XL Launchnews.northropgrumman.com
  11. Spaceflight NowNASA, Northrop Grumman repurpose Gateway elements for Moon Base demo missionsspaceflightnow.com

Update this profile

Work at Northrop Grumman or represent it? If something here is wrong or missing, email contact@spaceexploration.news with a public source for the change. Every profile edit is verified before it is published.

Request a profile change