Latest edition · Thursday, 26 November 2026 · BengaluruIndependent · Source-led

Orbital infrastructure regulation

FCC conditionally approves SpaceX’s million-satellite data center network

The accepted debris plan covers operations below 600 kilometres. Further approvals remain pending, while astronomers warn of risks to research facilities worldwide.

Report a correction
Add us as a preferred source on Google
FCC order title page naming the SpaceX Orbital Data Center System and its November 25, 2026 adoption and release dates
Source document: Title-page excerpt from the FCC’s November 25, 2026 Starmind order, DA 26-1273. Captured from the official attachment; browser controls and blank margins excluded. Credit: Federal Communications Commission.

The U.S. Federal Communications Commission conditionally authorized SpaceX on November 25 to deploy and operate Starmind, a proposed network of up to one million orbital data-center satellites. The order grants regulatory permission, rather than establishing a deployed constellation.

The accepted debris analysis covers operations below 600 kilometres. SpaceX must obtain approval of a final debris-mitigation plan before deploying above that altitude. The FCC also deferred a waiver for satellites that would not be disposed of through atmospheric reentry.

The order requires one operational satellite by November 25, 2033; 10% of the authorized constellation by 2035; 50% by 2038; and completion by 2040. Its 15-year licence term starts after the first compliant satellite enters operation.

The American Astronomical Society’s November 25 response warns of effects on optical, infrared and radio astronomy at facilities around the world. It cites bright satellites, radio emissions, waste heat, atmospheric pollution and collision risks. These are prospective concerns, rather than measured effects from Starmind.

The FCC dismissed optical-astronomy and environmental objections it considered outside its authority. Ars Technica reports that the permission does not establish technical or economic viability. Further debris approvals remain outstanding.

Reporting trail

Primary sources

Share this report

Share on LinkedIn ↗Share on X ↗

Branded story card: SpaceX’s Starmind permission covers up to a million satellites, with debris approvals still pending

For an image post, download the card and copy this suggested caption.

The accepted debris plan covers operations below 600 kilometres. Further approvals remain pending, while astronomers warn of risks to research facilities worldwide. Read the full report: https://www.spaceexploration.in/news/fcc-starmind-million-satellite-authorization #SpaceExplorationNews #SpaceNews #SpacePolicy
Download image

Companies in this story